Rebar Estimation Class: 17 (Slab on Grade) Part - 2

  Slab Bolster & Slab Bolster Upper   Slab Bolster height = 2”   Length of Slab Bolster = 5+4 = 9’- 0”  Number of Slab Bolster = 200/9  = 22.22                                            = 23+1 = 24            No. of SB   =  150 -  (2 X ½ Spacing)                                          Spacing                             =  150  -   4                                       4                                            =  146 / 4                             =  36.5 + 1  = 38                         Total number of SB =  24 X 38                                   =  720 Nos.   Total linear feet = 720 X 5                            = 3600 L ft     Required = 720 Nos. 2” Height of SB (5’-0”) Length The total length of the Beam Bolster 3600’- 0” L ft         Individual high chair  ( I H C )            No. of IHC   =  200 -  (2 X ½ Spacing)                                          Spacing                             = 

How to convert paisa to percentage and percentage to paisa to calculate interest - வட்டியைக் கணக்கிட பைசாவை சதவீதமாகவும், சதவீதத்தை பைசாவாகவும் மாற்றுவது எப்படி

 How to convert paisa to percentage and percentage to paisa to calculate interest

வட்டியைக் கணக்கிட பைசாவை சதவீதமாகவும், சதவீதத்தை பைசாவாகவும் மாற்றுவது எப்படி

Paisa to Percentage

பைசாவை சதவீதமாக மாற்றுவது

பைசா / 100 X 12 = %

1 ரூபாய் = 100 பைசா  interest is equal to 12%

 

 

1.5 பைசா =  1.5/100   X   12 = 0.18%

10 பைசா =  10/100   X   12 = 1.2%

25 பைசா =  25/100   X   12 = 3.0%

50 பைசா =  50/100   X   12 = 6.0%

75 பைசா =  75/100   X   12 = 9.0%

1  ரூபாய் = 100 பைசா =  100/100   X   12 = 12.0%

 

Percentage to Paisa

 

%   X  100   / 12 = பைசா

12% interest is equal to 100 பைசா 

 

1% = 1X100 / 12 = 8.33 பைசா

 

1.25% = 1.25X100 / 12 = 10.42 பைசா

 

 

12% = 12X100 / 12 = 100 பைசா

 

12.5% = 12.5X100 / 12 = 104.16 பைசா

 

Comments

Popular posts from this blog

How to Calculate Cement, Sand, Aggregate Quantity of Concrete